New ADU development solutions for Rental Owners. Talk to sales
Schedule ADU Consultation
(714) 942-2748 ext: 173

Placentia ADUs

Everything about building Accessory Dwelling Units in Placentia, CA

Research local zoning codes for ADU design
Calculate returns and costs to get financing
Get quotes to design and build your ADU project

Check your property's zoning, browse designs & get contractor estimates for your ADU project:

I'm interested in

740 sqft
Fullerton


749 sf
1 Bed

Placentia ADU Guidelines Last Updated 08/14/21

The city government of Placentia will approve ADUs under California's statewide mandated regulations.
The California Building Code (CBC) 2019 is adopted.

hintsights

City Hint: The City of Placentia permitted a total of 16 ADU projects in the past year of 2020.


Number of ADUs allowed:

According to state law, all single-family homes are allowed at least one ADU. Additionally, single-family lots which are owner-occupied may create one ADU and one Junior Accessory Dwelling Unit. Also, multi-family lots may now add one ADU per every four existing residential units, so long as they were legally established.

Types of ADUs allowed:

Detached ADU, Attached ADU, Junior ADU are permitted. ADUs may be new construction or converted from existing space. JADUs must be converted from existing space.

Lot size:

Single family and multi-family residential lots will not be subject to the minimum lot size of the underlying zoning district or by ordinance for Accessory Dwelling Unit (ADU) projects. ~ AB-68

ADU size:

Single-family and multi-family Properties will be approved to add up to 850 sq.ft. for a one bedroom ADU or up to 1,000 sq.ft. for a two bedroom ADU, regardless of the underlying zoning standards of the property. A Junior Accessort Dwelling Unit (JADU) up to 500 sq.ft. is approved. The minimum size of any living unit (including Accessory Dwelling Unit (ADU)s and Junior Accessort Dwelling Unit (JADU)s) is 150 sq.ft. according to California Residential Code. ~ Updated: State Law AB-68

Setbacks:

Newly constructed detached Accessory Dwelling Units can be as close as 4 feet from the rear and side property lines. Setbacks will not be required for Accessory Dwelling Units and Junior ADUs converted from existing space that was legally eastablished. Attached Accessory Dwelling Units and conversions from existing space to be expanded will be required to comply with the setbacks of the underlying zone. ~ AB68 & AB881 Update

Parking:

Parcels which convert an existing garage to an Accessory Dwelling Unit or JADU will not be subject to replacement parking requirements. ~ Updated: State Law AB-68

Fire Safety:

Accessory dwelling units shall not be required to provide fire sprinklers unless they are also required for the primary dwelling. ~ State Standards

Shape, materials and style:

Specific design styles and restrictions are not specified under State Standards. Passageways shall not be required in conjunction with the construction of an accessory dwelling unit. ~ State Standards

Height:

The maximum height of an ADU is not specified in the state standards. If ADU maximum height is not established locally, the height limitations of the underlying zone shall apply. ~ State Standards

Design review:

The municipality shall provide a ministerial review process which is not based on a discretionary approval for an ADU. The process shall take no less than 120 days. Valid applications submitted for ADUs, if not approved or denied within 120 days from submission, shall be considered approved. ~ State Standards

Number of Bedrooms:

No maximum number of bedrooms is established other than that implied by the maximum size of an ADU allowed. ~ State Standards

Ownership:

Between between 2020 and 2025, owner occupancy requirements will not apply to new Accessory Dwelling Unit (ADU)s. (applicable to new construction and conversion units) ~ SB13

Utility connections:

Connection and utility fees shall be reasonable, and shall not be disproportionately higher than those to develop primary dwellings, so as not to deter the development of ADUs. If a private sewage disposal system is used, such as a septic system, review and approval by a local health officer may be required. ~ State Standards

Allowed Zones:

*** Beginning in 2020, according to state law, all residential zoning districts, including single-family and multi-family, are allowed to build Accessory Dwelling Units. ***

Residential Building Code:

The California Building Code (CBC) 2019 is adopted.

Call/Text ADU Operator (714) 942-2748
Dial Ext: 173


ADU Design Library

Browse hundreds of models to find the right fit for your property.

ADU Model 540 sqft

36 ft x 15 ft

ADU Model 300 sqft

30 ft x 10 ft

ADU Model 500 sqft

25 ft x 20 ft

Estimate Your ADU Potential
Financing
Costs / ROI

ADU Cost Estimate Range
Select ADU type

Low

$100k

$100 / sf

High

$200k

$200 / sf
Select ADU type

Construction

Conversion
Select ADU size

700 sf

This estimate is based on recently completed projects in the area and is inclusive of all typical soft costs such as permitting, design and engineering fees.

Get started
Next

Take the next step on ADU Marketplace

Get advice from local expert ADU designers and builders

I'm interested in